Concrete construction site with active foundation work

Reports and field output

Send a quote, not a scavenger hunt.

When the estimate is finished, the office and field need clean outputs that match the scope. Level Estimate turns the same takeoff and assembly data into quote reports, BOMs, pour reports, and field packages.

Bid: Building A foundationChecked

Plan objects

Assembly C-WALL-08

8 in foundation wall

Length
146.4 lf
Concrete
43.4 cy
Forms
3,514 sf
Rebar
1,286 lb
QuoteBOM by pourLabor by pourField package

What it covers

Turn bid data into usable backup.

A concrete estimate should not die as a single proposal PDF. Level Estimate keeps quote reports, materials, labor, pours, and field output connected to the same scope the estimator reviewed.

  • Customer quote reports with scope, alternates, exclusions, and totals.
  • BOM summary, BOM by pour, concrete by pour, labor by pour, and assembly-code lists.
  • Panel shipment counts, forming lists, wall details, and layout/background files when the job needs them.
  • Traceable backup for revisions, change-order discussions, material ordering, and estimator-to-field handoff.
Concrete construction site with crews and forms

Sample outputs

Office and field output from the same estimate.

The cleanest concrete bid is not only a number. It is a quote, backup, material plan, labor view, and field package that all match the same scope.

Quote packageCustomer quote, scope notes, alternates, exclusions, and totals ready for review.
BOM by pourMaterials grouped by pour so ordering and staging match how the work gets built.
Concrete by pourCubic yards, waste, rounding, and pour sequence quantities for the office and field.
Labor by pourMan-hours and labor assumptions visible by scope, building, or pour group.
Forming outputPanel material counts, shipment planning, fillers, corners, shutoffs, and layout detail support.
Output

Quote package

Customer quote, scope notes, alternates, exclusions, and totals ready for review.

Output

BOM by pour

Materials grouped by pour so ordering and staging match how the work gets built.

Output

Concrete by pour

Cubic yards, waste, rounding, and pour sequence quantities for the office and field.

Output

Labor by pour

Man-hours and labor assumptions visible by scope, building, or pour group.

Output

Forming output

Panel material counts, shipment planning, fillers, corners, shutoffs, and layout detail support.

Request a demo

Bring a real concrete bid. We will walk through the workflow on your kind of job.

Show us how you estimate today. Level Estimate is built for contractors who need estimator-controlled takeoff, pricing, reports, and field output without spreadsheet re-entry.